All development records
v033Revision requested

Blue geology reset: three native topology-rebuild trials rejected

After feedback that v057 looked nothing like natural terrain, the highest-priority Mother Composition and blue-detail reference were reviewed again. Incremental vertex pushes, low-poly modifiers and inserted capes on the circular reservoir wall were abandoned. Three separate native Blender geology rebuilds started from the preserved v051: v058 replaced the forelake land via a shoreline distance field, v059 replaced the disconnected front/back coast with an integrated landscape, and v060 regenerated a curved river around the preserved bridge, lighthouse and waterfall. All three failed visual review: v058 shows an obvious rectangular land-mesh join; v059 retains featureless broad slopes and extensive rock/water intersections; v060 creates an artificial trench with jagged edges and terrain/water gaps. None is accepted or recommended as a production scene.

Continued from Emotion Mask · real Blender model · fixed 16:9 overview

01 / Revision

What changed in this revision.

  1. Reopened the actual master composition and blue detail to confirm the intended coastal archipelago, strata and natural valley are not one semicircular reservoir.
  2. v058 independently rebuilt the near-cape terrain with 12,816 faces from shoreline distance and strata; visible rectangular joins and suspended water edges caused rejection.
  3. v059 replaced the mismatched back/near banks with one 36,590-face land mesh; it remained a featureless mass with worsened rock/water intersection and was rejected.
  4. v060 rebuilt a curved river and surrounding banks while retaining lighthouse, bridge, falls and cameras; genuine renders showed an excavated artificial trench, spikes and broken bank transitions, so it was rejected.
  5. No Unity scenes were replaced and none of these failed experiments overwrote the v051 or v057 source models.

02 / Comparison

The same camera, before and after.

The reference and model are identified separately. Every result shown here is rendered from an actual saved model.

Old retaining wall vs excavated channel: both rejected
Old retaining wall vs excavated channel: both rejectedv057 looks like a constructed retaining wall; v060 looks like a dug trench. Both are rejected.
Geology prototypes: rectangular seam and broad slope
Geology prototypes: rectangular seam and broad slopev058's visible seam and v059's broad monotone hill do not match the reference.
Master reference and failed prototype
Master reference and failed prototypeShows the discrepancy rather than implying acceptance.

03 / Actual model

Look beyond the main camera.

Cloud-free views retain their original proportions. Open an image for a closer look.

04 / Review

Checks and the current review state.

Technical checks pending · Revision requested

Checked

Native multi-angle review

Each trial has a separate saved native Blender model and genuine matching close-up and top renders; the page compares v057–v060 with the master art reference without passing off concept imagery as models.

Checked

v059 lakebed technical failure

Across 2,939 sampled water triangle centres, v059 had 123 above-water terrain hits, violating basic riverbed continuity.

Checked

v060 river/shore joins remain defective

v060 generated a 360-triangle upper-water strip covering about 310,060 m². One above-water rock hit was found across 120 sampled triangle centres; the native render exposes more significant cracks and straight-edged joins despite the lower sample count.

Checked

No art approval

All three remain structurally unlike the mother composition: missing geological mass hierarchy, banks disconnected from ridge formation, and an implausible waterfall mouth. They remain archived studies rather than the next production baseline.

05 / Next

What to focus on next.

Stop patching the old enclosed basin or these unsuccessful generated heightfields. The next stage needs a geology-first blockout with large stratified coasts, coherent ridge directions and an open gorge, verified against multiple reference camera angles before fitting a truly continuous watercourse. Do not replace the production world before visual acceptance.

About Psykeidos