All development records
v025Revision requested

Blender blue-region rebuild: unify lighthouse inlet, river and forelake

Responding to the separated-looking water below-left of the lighthouse, this pass replaces the old split coast meshes with one contiguous closed terrain solid and regenerates one upper-water mesh across the river, bridge bay, lighthouse inlet and projecting forelake. The retained Blender v035 keeps the old terrain hidden for rollback. Connectivity and sampled lakebed checks pass, while the stepped outer rock faces still need artistic refinement.

Continued from Emotion Mask · real Blender model · fixed 16:9 overview

01 / Revision

What changed in this revision.

  1. v028 carved an actual 3D inlet with booleans; v029 regenerated the water. Native review revealed exposed gaps and cutting artifacts, so both were rejected.
  2. v030 resampled v026 to rebuild the mainland, forelake shores and lighthouse hillside as one closed continuous terrain; the three original source meshes remain archived and hidden.
  3. v031 regenerated one planar upper-water mesh on the actual riverbed, dropping only a five-face, roughly 36 m² detached fragment while retaining all six approved water witnesses in the main component.
  4. v032 resculpted the connected lighthouse shoulders and lake transition; v033/v034 refined the distinction between offshore cliffs and submerged riverbanks instead of treating every shore as an upright wall.
  5. v035 reclipped the upper water to the final terrain, removing sampled water/rock overlaps while leaving the lighthouse, bridge, outlets and frozen cameras in place.

02 / Comparison

The same camera, before and after.

The reference and model are identified separately. Every result shown here is rendered from an actual saved model.

Original v026 vs rebuilt v035 · fixed overview
Original v026 vs rebuilt v035 · fixed overviewBoth are genuine Blender blockout renders; the rebuilt structure still needs artistic finishing.
Blue top view · river–forelake continuity
Blue top view · river–forelake continuityComparing the river valley, lighthouse landmass and forelake banks.
Highest-priority mother comparison
Highest-priority mother comparisonThe original primary reference vista is left; the actual saved v035 clay render is right.

03 / Actual model

Look beyond the main camera.

Cloud-free views retain their original proportions. Open an image for a closer look.

04 / Review

Checks and the current review state.

Technical checks pending · Revision requested

Checked

Single connected terrain solid

The v035 main blue solid has 36,296 vertices and 36,294 faces with zero nonmanifold edges and descends from one topologically connected terrain mesh rather than three adjacent blockouts.

Checked

Contiguous upper water

The final upper water contains 4,703 vertices and 8,510 triangles in one connected component. All six witnesses—from upstream and bridge bay through forelake and right branch to two outlet inlets—remain connected at world elevation −225 m.

Checked

Actual lakebed sample validation

Sampling 2,837 final water triangles found zero missing terrain bed and zero exposed rock above the water; 39 sampled overlaps found before reclipping were corrected. This is sampled evidence, not full technical sign-off.

Checked

Independent files and actual renders

v026 and independent v028–v035 candidates remain intact. Retained v035 source SHA256: 2ec47423865636bf6cd65f81c0593783e2a1f9a75ffd90d7424c223a9ff8dff2. Seven native 1920×1080 cloud-free images were rendered from that saved model.

05 / Next

What to focus on next.

Next refine the outer shore slope and near-lake cliff strata to remove repeating heightfield bands without undoing the verified continuous water, rockbed or landmark anchors. Reassess the reference composition and eventual Unity vantage afterwards.

About Psykeidos